|
The brief from the client was a complete turn key solution, to construct a temporary storage facility. The interim nature and urgency constrained the choice of structure a to a pre-engineered structure that could be designed, delivered and installed Located in Western Australia, adjacent to the Indian Ocean the structure, experiences a harsh, windswept The complete ‘turn-key’ solution required all services and facilities to comply with the BCA, Defence MFPE (Manual of Fire Protection Engineering) and relevant AS/NZ Specification, included Personnel Doors, Roller Doors, Mechanical Fan and Ventilation System, Lighting Systems, Engineered Fire Services,including Aspirating Fire Detection System (VESDA), Hydrocarbon Detection System (Fuel Spill Detection), Roof Safety System, Racking System, Signage and Lightning Protection System. |
|